CISUC

MAPP–A web-based decision support system for the mould industry

Authors

Abstract

This paper describes the MAPP, 'Mould: Assistant Production Planner�, a web-based decision support system developed for the mould industry. MAPP addresses two subsystems considered fundamental by the managers of a case study company: (1) production planning and control and (2) information and document management. The production planning methodology implemented is based on the workload control concept developed at Lancaster University, adapted to the context of the moulds industry, under a Rapid Prototyping case study. The main objectives of this paper are to present a discussion of the system functions at the service of the planning methodology, and to explain the development decisions in the socio-technical context of the case study company. We conclude with a brief overview of issues raised in lab and field testing, along with some proposals for further research.

Subject

Information Systems Development

Journal

Decision Support Systems, Vol. 42, #2, pp. 999-1014, Elsevier, November 2006

Cited by

Year 2016 : 1 citations

 Liu, J. J., Li, Z. T., Chen, Q. X., & Mao, N. (2016). Controlling delivery and energy performance of parallel batch processors in dynamic mould manufacturing. Computers & Operations Research, 66, 116-129.

Year 2015 : 4 citations

 Stevenson, M., & Vanharanta, M. (2015). The effects of managerial decision making behaviour and order book size on workload control system implementation in Make-To-Order companies. Production Planning & Control, 26(2), 97-115.

 Thürer, M., Stevenson, M., & Qu, T. (2015). Simple subcontracting rules for make-to-order shops with limited subcontractor capacity: an assessment by simulation. Production Planning & Control, 26(13), 1145-1161.

 Silva, C., Stevenson, M., & Thurer, M. (2015). A case study of the successful implementation of Workload Control: A practitioner-led approach. Journal of Manufacturing Technology Management, 26(2), 280-296.

 ?engül, S. Ç., Sakarya, A. O., Kaya, H. V., & Kahraman, Z. E. (2015). A System Design for Facilitating Human Resource Decisions in Small and Medium Sized Enterprises in Turkey.

Year 2014 : 2 citations

 M Thürer, M Stevenson, T Qu, Moacir Godinho Filho (2014). The design of simple subcontracting rules for make-to-order shops: An assessment by simulation- European Journal of Operational Research, 2014 - Elsevier

 Y Xie, H Wang (2014) A Group Cooperative Decision Support System Based on Extended Contract Net, Group Decision and Negotiation, 2014 - Springer

Year 2013 : 6 citations

 Stevenson, M., & Vanharanta, M. (2013). The effects of managerial decision making behaviour and order book size on workload control system implementation in Make-To-Order companies. Production Planning & Control, (ahead-of-print), 1-19.

 Zheng Xu-Xu, & Liu Jianjun. (2013). Research delivery can be negotiated based on limited resource estimation methods mold. Light Industry Technology, (8), 87-89.

 Thuerer, M., Stevenson, M., Silva, C., Land, M., & Filho, M. G. (2013). Workload control and order release in two-level multi-stage job shops: an assessment by simulation. International Journal of Production Research, 51(3), 869-882.

 Liu, J. J., Chen, Q. X., Mao, N., & Chen, X. D. (2013). Bi-objective dynamic control of batch processor with non-identical jobs in mould manufacturing. International Journal of Production Research, 51(6), 1820-1835.

 Liu, J. J., Lin, Z. A., Chen, Q. X., Mao, N., & Chen, X. D. (2013). A decision support to assign mould due date at customer enquiry stage in computer-integrated manufacturing (CIM) environments. International Journal of Computer Integrated Manufacturing, 26(6), 571-582.

 Xie, Y., & Wang, H. (2013). A Group Cooperative Decision Support System Based on Extended Contract Net. Group Decision and Negotiation, 1-27.

Year 2012 : 5 citations

 Thürer, M., Stevenson, M., Silva, C., Land, M. J., & Fredendall, L. D. (2012). Workload Control and Order Release: A Lean Solution for Make?to?Order Companies. Production and Operations Management, 21(5), 939-953.

 Thürer, M., Stevenson, M., Silva, C., & Huang, G. (2012). The application of workload control in assembly job shops: an assessment by simulation. International Journal of Production Research, 50(18), 5048-5062.

 Thürer, M., Silva, C., Stevenson, M., & Land, M. (2012). Improving the applicability of workload control (WLC): the influence of sequence-dependent set-up times on workload controlled job shops. International Journal of Production Research, 50(22), 6419-6430.

 Silva, C., Thurer, M., & Stevenson, M. (2012). A case study of the successful implementation of Workload Control: A practitioner-led approach. Simulation, 9, 10-7.

 Thürer, M., Huang, G., Stevenson, M., Silva, C., & Filho, M. G. (2012). The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation. International Journal of Production Research, 50(20), 5949-5965.

Year 2011 : 8 citations

 Thürer, M., Stevenson, M., & Silva, C. (2011). Three decades of workload control research: a systematic review of the literature. International Journal of Production Research, 49(23), 6905-6935.

 Stevenson, M., Huang, Y., Hendry, L. C., & Soepenberg, E. (2011). The theory and practice of workload control: A research agenda and implementation strategy. International Journal of Production Economics, 131(2), 689-700.

 Thürer, M., Silva, C., & Stevenson, M. (2011). Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. International Journal of Production Research, 49(4), 1151-1171.

 Choy, K. L., Leung, Y. K., Chow, H. K., Poon, T. C., Kwong, C. K., Ho, G. T., & Kwok, S. K. (2011). A hybrid scheduling decision support model for minimizing job tardiness in a make-to-order based mould manufacturing environment. Expert Systems with Applications, 38(3), 1931-1941.

 García-Crespo, Á., Ruiz-Mezcua, B., López-Cuadrado, J. L., & González-Carrasco, I. (2011). A review of conventional and knowledge based systems for machining price quotation. Journal of Intelligent Manufacturing, 22(6), 823-841.

 Liu, J. J., Chen, Q. X., Mao, N., & Lin, Z. A. (2011). A multi-agent-based mould due date setting approach in stochastic production. International Journal of Production Research, 49(5), 1353-1371.

 Hasan, S. K., Sarker, R., Essam, D., & Kacem, I. (2011). A DSS for job scheduling under process interruptions. Flexible services and manufacturing journal, 23(2), 137-155.

 Martinazzo, D. (2011). VALUTAZIONE DEI PARAMETRI E DELLE LOGICHE DI FUNZIONAMENTO DEL WORKLOAD CONTROL (WLC) TRAMITE SIMULAZIONE DI UN SISTEMA PRODUTTIVO COMPLESSO.

Year 2010 : 6 citations

 Liu, S., Duffy, A. H., Whitfield, R. I., & Boyle, I. M. (2010). Integration of decision support systems to improve decision support performance. Knowledge and Information Systems, 22(3), 261-286.

 Thürer, M., Silva, C., & Stevenson, M. (2010). Workload control release mechanisms: from practice back to theory building. International Journal of Production Research, 48(12), 3593-3617.

 Leung, Y. K., Choy, K. L., & Kwong, C. K. (2010). A real-time hybrid information-sharing and decision support system for the mould industry. The Journal of High Technology Management Research, 21(1), 64-77.

 ???, ???, & ???. (2010). ???????????????? [J]. ?????????, 16(2), 249-255.

 Razi, M., Athappilly, K., & Rea, A. (2010). The Community Health Information System (CHIS): delivering web-based customised healthcare using an AI-infused expert system. International Journal of Electronic Healthcare, 5(3), 303-325.

 ???, ???, ??, & ??. (2010). ?????????????????. ?????????, 16(002), 263-270.

Year 2009 : 7 citations

 Land, M. J. (2009). Cobacabana (control of balance by card-based navigation): A card-based system for job shop control. International Journal of Production Economics, 117(1), 97-103.

 Stevenson, M., Huang, Y., & Hendry, L. C. (2009). The development and application of an interactive end-user training tool: part of an implementation strategy for workload control. Production Planning and Control, 20(7), 622-635.

 Dlodlo, N., Hunter, L., Cele, C., Botha, A. F., & Metelerkamp, R. (2009). A decision support system for wool classification. Autex Research Journal, 9(2), 42-46.

 Liu, J. J., Chen, Q. X., & Mao, N. (2009, November). An input control job release mechanism for mould industry in environment of stochastic production. In Materials Science Forum (Vol. 626, pp. 753-758).

 Phan, B. N., Land, M. J., & Gaalman, G. J. C. (2009, December). Workload control with continuous release. In Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on (pp. 1905-1909). IEEE.

 Kuehnle, H., Bergmann, U., & Lüder, A. (2009). Design of Multi-Agent Decision Support for Configurations of Manufacturing Networks. In ICE international conference, Leiben.

 Hasan, S. K. (2009). Evolutionary Algorithms for Solving Job-Shop Scheduling Problems in the Presence of Process Interruptions (Doctoral dissertation, Australian Defence Force Academy).

Year 2008 : 3 citations

 Hendry, L., Land, M., Stevenson, M., & Gaalman, G. (2008). Investigating implementation issues for workload control (WLC): a comparative case study analysis. International Journal of Production Economics, 112(1), 452-469.

 Stevenson, M., & Silva, C. (2008). Theoretical development of a workload control methodology: evidence from two case studies. International Journal of Production Research, 46(11), 3107-3131.

 Leung, Y. K., Choy, K. L., & Kwong, C. K. (2008, July). Development of a real-time collaborative process planning management system for the mould industry. In Management of Engineering & Technology, 2008. PICMET 2008. Portland International Conference on (pp. 266-275). IEEE.

Year 2007 : 3 citations

 Stevenson, M., & Hendry, L. C. (2007). Improving supply chain integration using a workload control concept and web-functionality. Production Planning and Control, 18(2), 142-155.

 Subsorn, P., & Singh, K. (2007). DSS applications as a business enhancement strategy. In Proceedings from the 3rd annual Transforming Information and Learning Conference.

 Hasan, S. K., Sarker, R., & Essam, D. A Decision Support System for Solving Job-Shop Scheduling Problems Using Genetic Algorithms.

Year 2006 : 1 citations

 Design of an End-of-Life Decision Support System using Product Embedded Information Device Technology, Hui Cao, Paul Folan, Zheng Lu, Julien Mascolo, Nicoletta Francone, Jim Browne, Dienstag, 25. Juli 2006

Year 2005 : 1 citations

 Design of a Web-based Decision Support System for End-of-Life Vehicles, H. Cao, Galway, Ireland, 2005